TANK project, Stora Enso

- Destination: Enocell
- Construction Contracts RU1 and RU2
- Contract sum: 3.0 million euro
- Construction period: 12 months
- Subscriber: Stora Enso
- Project: Main task
- A challenging construction site in concrete, primarily inside an ongoing factory.
- Challenging working conditions in temperatures of +40 degrees Celsius
- The most challenging part was the reinforcement of the beams on the 3rd floor and the associated columns from the pile foundations and forward, with piling being carried out inside the factory.
- Chosen by the client: the award “Best actor in the project”